Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Heat intensifies severe drought across European nations

    July 24, 2026

    Amazon wildfires in Brazil fall to lowest level in four decades

    July 23, 2026

    Powering Exceptional Guest Experiences with Intelligent Energy: The Peech Hotel’s Journey with Sungrow

    July 23, 2026
    • Home
    • Contact Us
    cairotribune.comcairotribune.com
    • Automotive
    • Business
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • Sports
    • Technology
    • Travel
    cairotribune.comcairotribune.com
    Home » Jinko Power Announces PPA Signing for Tabarjal 400 MW Solar PV Project in the Kingdom of Saudi Arabia
    PR Newswire

    Jinko Power Announces PPA Signing for Tabarjal 400 MW Solar PV Project in the Kingdom of Saudi Arabia

    November 10, 2023
    Facebook WhatsApp Twitter Pinterest LinkedIn Telegram Tumblr Email Reddit VKontakte

    SHANGHAI, Nov. 10, 2023 /PRNewswire/ — Jinko Power Technology Co., Ltd (601778.SH), (the “Company”) or “JinkoPower” is pleased to announce the successful signing of Power Purchase Agreement (PPA) with the Saudi Power Procurement Company (SPPC) for the Tabarjal 400 MW Solar PV Project (the “Project”), under the Round 4 of National Renewable Energy Program (NREP). This is an important step forward for Jinko Power’s strategy to grow business in the Kingdom of Saudi Arabia (KSA) in addition to its first project, SAAD 300 MWac, which was awarded in 2022 and is currently under construction. With this latest addition, Jinko Power’s total portfolio of projects in the Kingdom of Saudi Arabia now stands at 700 MWp in terms of net MWs awarded /currently under construction, which makes it one of the leading developer in the Kingdom renewable energy market. The Project is located approximately 17 km northeast of the city of Tabarjal, in the Al-Jouf Province, KSA. Electricity generated from the Project will be acquired by SPPC through a 25-year PPA. The construction is scheduled to spread over 2024 to 2025. The plant will use bifacial solar panels, the latest technology that will receive solar irradiation on both the front and backside of the panels, thus increasing energy generation efficiency. Once operational, the plant is expected to reduce KSA’s CO2 emissions by more than [717] thousand metric tons per year. “We are delighted to continue our successful track record in the Kingdom of Saudi Arabia with our second successful tender submission in a span of 3 years since we entered into the KSA,” Charles Bai, President of JinkoPower International Business said. “This award underpins our commitment to the Kingdom’s renewable energy roadmap and I look forward to a successful development and construction of this portfolio of projects. We would like to thank SPPC and Ministry of Energy for a fair and efficient tendering process paving the way for international developers like ourselves to enter and thrive in the market. We are keenly looking for future pipeline projects given its massive potential, as well as strategic alignment towards decarbonisation and renewable energy generation in the Kingdom,” he added.

    Mothana Qteishat, Vice-President of JinkoPower International Business, said, “We are extremely pleased that JinkoPower has achieved a 100% track record with respect to our participation in tenders in the Kingdom of Saudi Arabia, having participated in and won two tenders. With Tabarjal and Saad projects, JinkoPower shall own 700MW in the kingdom. The achievement of financial close for the SAAD project and signing of the PPA for the Tabarjal project shall cement our foundations in KSA and allow for many further successes in the Kingdom.”

    About Jinko Power

    Founded in 2011, Jinko Power is a well-known global IPP that develops, builds, finances, owns and operates solar power plants. We strive to make solar the most sustainable and competitive source of energy worldwide.

    As of June 2023, the company has owned and connected over 4 GW solar projects in China and over 4.2 GW of solar projects operating or under construction globally. We manage a large international portfolio of assets, including the world’s largest solar plant under operation that we partially took part in. We are developing a global pipeline of GW scaled projects in our key markets including China, the Middle East, Europe, Latin America and Asia Pacific.

    www.jinkopower.com

    Photo – https://mma.prnewswire.com/media/2273284/Jinko.jpg

    Cision View original content:https://www.prnewswire.co.uk/news-releases/jinko-power-announces-ppa-signing-for-tabarjal-400-mw-solar-pv-project-in-the-kingdom-of-saudi-arabia-301984540.html

    Related Posts

    Powering Exceptional Guest Experiences with Intelligent Energy: The Peech Hotel’s Journey with Sungrow

    July 23, 2026

    Binance Further Expands VIP Access with Updated Holder and OTC Criteria

    July 21, 2026

    3TREES Sets Guinness World Record: The Largest Coatings Showroom — Grand Opening of 3TREES Quality Homes Technology Experience Center

    July 17, 2026

    Blackview Opens Its First Brand Store in Ghana, Further Strengthening Its Presence Across Africa

    July 15, 2026

    Binance Marks Nine Years: Nearly Half of All Crypto Holders Use Binance, $156 Trillion in All-Time Volume, and a Growing Vision Beyond Crypto

    July 14, 2026

    SAUDI INTRODUCES “PACKAGE VISA”, INTEGRATING TRAVEL BOOKING WITH EASIER VISA APPLICATION

    July 9, 2026
    Current News

    Heat intensifies severe drought across European nations

    July 24, 2026

    Amazon wildfires in Brazil fall to lowest level in four decades

    July 23, 2026

    Private sector wage growth hits six year low in latest UK data

    July 22, 2026

    IOM launches $98 million appeal for Venezuela quake recovery

    July 18, 2026

    Indonesia begins building $20.9 billion Masela LNG project

    July 18, 2026

    DR Congo Ebola outbreak reaches 2,267 cases and 893 deaths

    July 18, 2026

    UN urges fair rules for artificial intelligence worldwide

    July 18, 2026

    Northern Ontario wildfires trigger evacuations and closures

    July 16, 2026

    flydubai Bangkok flights rise to 14 weekly services

    July 16, 2026
    © 2026 Cairo Tribune | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.